Job Safety Analysis (JSA) – Energization and Commissioning of WS3 ABB RTU
A 3-page Job Safety Analysis covering the energization and commissioning of the WS3 ABB RTU, including work permit, working at height, electrical hazards, classified-area controls, PPE and housekeeping requirements.
From the document
JOB SAFETY ANALYSIS Ref: – JSA- ……. Facility / Site: WS3 sourour Location within Site: Battery solar panel unit RTU SHELTER Permit No: Permit Type: Hot Date: • Task Description: Energization and COMMISSION WS3 ABB RTU REQUIRED REFERENCES JSA REVIEW Have the relevant Procedures, Standards, Guidelines, or Safe Work Practices been reviewed? Yes N/A Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the significant Task Steps, Hazards, and Controls. JSA REVIEWER (Supervisor or Designate): RISK ASSESSMENT Must existing Procedures or Work Practices be modified to perform this work? Yes No Name / Signature: David BAIRD Company: MSBI After mitigation, are there any hazards that continue to present a potentially significant risk? (Scenario-Based Risk Assessment required) Yes No WORK SITE VERIFICATION The Work Team has assessed the worksite conditions and confirms: • The JSA addresses the applicable hazards and necessary controls. • The Team has the appropriate resources (people and equipment) to do the job safely. • Others that could be affected by the work have been informed. TASK LEADER: PPE REQUIRED DURING THIS TASK HARD HAT SAFETY …
Read Job Safety Analysis (JSA) – Energization and Commissioning of WS3 ABB RTU online